Company Logo
Skip navigation links
Home
About us
The programme
Partners
Image gallery
Flythroughs
BREEAM
Contacts
News
 
 
  Skip navigation links
Carlton Community College
Darton ALC
Greenacre
Holy Trinity
Horizon Community College
Kirk Balk ALC
Penistone Grammar ALC
Shafton ALC
Springwell Community School
The Dearne ALC
KIRK BALK ALC 

Key Facts and Figures

Basic building cost:

£959.50/m2

 

 

Services cost:

£314 / m2

 

 

External works cost:

£148 / m2

 

 

Target BREEAM rating ansd score:

All are designed for "very good" with aspirations for "excellent"

 

 

Gross floor area

12,290 m2

 

 

Total area of site:

7.3ha

 

 

Area of teaching spaces:

5,970m2

 

 

Area of circulation 

4,750m2

 

 

Area of storage:

440m2

 

 

Percentage area of school grounds to be used by community:

82%

 

 

Percentage area of school buildings to be used by community:

95%

 

 

Predicted electricity consumption:

47 kWh/m2

 

 

Predicted fossil fuel consumption:

4.2 kWh/m2

 

 

Predicted renewable energy generation:

0.79kWh/m2

 

 

Predicted water use:

3.54 m3/pupil/year (4m3/pupil/year total 1.64m3/pupil/year rainwater harvesting)